so i think what i'll do is order the 30" cube with two holes in the back for the fogger and water pump and a hole in the bottom for the drain. i'll also ask the builder to raise the bottom front partrition so the water depth will be greater. then ill work out the land area with exanded foam, the water and fogger intakes with pvc piping, and cork board for the background.
No comments:
Post a Comment